
Description
Pole building has been started, the frame and some of the steel panels have been installed on the roof and two walls. Material to finish the structure is located on the site.
-
0BEDS
-
10.98ACRES
-
0BATHS
-
01/2 BATHS
-
5,250SQFT
-
$105$/SQFT
School Ratings & Info
Description
Pole building has been started, the frame and some of the steel panels have been installed on the roof and two walls. Material to finish the structure is located on the site.
